How to Choose an Offshore BIM and Detailing Partner: A 10-Point Checklist

Engineers reviewing steel on site with an offshore detailing partner
In this article

To choose an offshore BIM and detailing partner, check five things before price: knowledge of U.S. standards, a documented quality-control process, real sample drawings, time-zone overlap with your team and a clear way of handling RFIs and revisions. A low hourly rate means little if drawings come back with errors that your shop or field crew has to fix.

This checklist is written for U.S. general contractors, steel and rebar fabricators and engineering firms that want to outsource modeling, detailing or coordination without losing control of quality.

Key takeaways

  • A good partner knows AISC, AWS, ACI 315 and CRSI practice, not just the software.
  • Ask how drawings are checked, and by whom, before they reach you.
  • Sample drawings and references tell you more than a sales presentation.
  • Working hours that overlap with yours shorten every RFI cycle.
  • Always test with a pilot package before awarding a full project.

What a BIM and detailing firm actually does

A BIM and detailing firm turns the approved design into models and fabrication documents: steel shop and erection drawings, rebar placing drawings and bar lists, federated models for clash detection, and quantity takeoffs. It works for the contractor or fabricator, and its drawings are reviewed by the Engineer of Record. It does not replace the designer.

That distinction matters when you evaluate proposals. You are hiring production capacity and precision, so judge candidates on the quality of what they produce and how they manage information.

The 10-point checklist

  1. U.S. standards. Ask which standards they detail to. For steel: AISC 360, the AISC Code of Standard Practice and AWS D1.1, all available from the American Institute of Steel Construction and AWS. For rebar: ACI 318, ACI 315 and the CRSI Manual of Standard Practice. A partner that only names software is a warning sign.
  2. Software that matches your workflow. Tekla Structures for steel and rebar, Revit for architecture and MEP, Navisworks for clash detection, and the ability to exchange IFC files.
  3. Quality-control process. Every drawing should be reviewed by a checker who did not draw it, against the design drawings and a written checklist.
  4. Sample drawings. Request real shop drawings or placing drawings from similar projects, with client details removed. Look at dimensioning, callouts, bar marks and general notes.
  5. References and portfolio. Ask for projects similar to yours in size and structural system, and speak with at least one client.
  6. Time-zone overlap. A team that works during your business day answers questions the same day. A twelve-hour gap adds a day to every exchange.
  7. English communication and RFIs. Ask to see a sample RFI. It should be specific, reference the drawing and propose a solution when possible.
  8. Revision control. Clouded revisions, revision numbers and a change log on every issue are non-negotiable.
  9. Information security. NDA, controlled access and work inside your shared environment if you require it.
  10. Clear pricing. Per ton, per sheet, per hour or lump sum, with what is included in revisions stated in writing.

Questions to ask a detailing partner before signing

QuestionWhat a good answer sounds like
Who checks the drawings?A named checker, separate from the detailer, using a written checklist
How do you handle missing information?Numbered RFIs, sent early, with a proposed solution
What are your working hours in my time zone?A clear overlap with your business day
How many revisions are included?A defined number, or revisions caused by design changes priced separately
Can we start with a pilot?Yes, with the same team that will run the full project

Red flags

  • No sample drawings, or samples that look generic.
  • Promises of delivery times that ignore the size of your package.
  • No independent checking step.
  • Answers that avoid naming the standards they work to.
  • Communication only through a salesperson, never with the people doing the work.

Detailing errors are expensive because they surface late, often on the shop floor or during erection. Our article on how detailing errors reach the shop floor shows where they come from, and how detailing software has changed what a modern partner should deliver.

Run a pilot before you commit

Pick a small but representative package: a few steel frames with typical connections, or one level of a concrete building. Give the partner the same information you would give for the full job, set a deadline and review the result with your shop or field team. You will learn more in two weeks than in any proposal.

For rebar, compare the pilot against what a complete rebar package includes. For steel and rebar scopes, our team delivers rebar placing drawings and bar lists and steel shop drawings on U.S. business hours from Panama. You can browse projects we have detailed or meet the team behind ADIPSA.

If you are still deciding whether to outsource at all, start with our guide on when outsourcing BIM pays off.

Frequently Asked Questions

What should I look for in a steel detailing company?

Knowledge of AISC and AWS practice, Tekla Structures experience, an independent checking process, real sample drawings and references from projects similar to yours.

Is offshore detailing reliable for U.S. projects?

It is when the partner works to U.S. standards, checks every drawing and communicates during your business day. Reliability depends on process, not geography.

How are detailing services usually priced?

Steel detailing is often priced per ton or lump sum, rebar detailing per ton or per sheet, and BIM coordination per hour or per month. Ask what revisions are included.

Who approves the shop drawings from an offshore partner?

The same people as always. The contractor reviews them, and the Engineer of Record reviews and approves them for conformance with the design.

How long does a pilot project take?

Usually one to three weeks, depending on the package. Use the same team that would run the full project so the pilot reflects real performance.

Have a project?

Talk to a Grupo ADIPSA engineer

Tell us what you are building or what you need detailed, and we will reply with the scope and the next steps.

Keep reading

Related articles

Estimator preparing a rebar takeoff from structural drawings
Rebar Detailing

Rebar Takeoff Guide: How to Estimate Reinforcing Steel Quantities

How to do a rebar takeoff from structural drawings, with standard bar weights, a worked example and the items estimators most often
Slab rebar grid used as an example of a rebar takeoff
Rebar Detailing

9 Rebar Detailing Mistakes That Delay Pours (and How to Catch Them Early)

The rebar detailing mistakes we find most often in reviews, why they happen and a reusable checklist to catch them before the
Reinforcing bars overlapping at a rebar lap splice inside a wall form
Rebar Detailing

Rebar Lap Splices, Development Length and Hooks: A Practical Guide

How rebar lap splices, development length and standard hooks work, when to use couplers and how these criteria show up in rebar